PW piping system

PW piping system design scheme 1. The connection parts of the purified water equipment system should be welded first, and then clamped, and the use of wire-tooth connection should be avoided.

Keywords:


Details description

PW piping system design scheme
1. The connection parts of the purified water equipment system should be welded first, and then clamped, and the use of wire-tooth connection should be avoided.
2. The whole system adopts the forming process of welding on one side and two sides, and adopts the automatic welding process of automatic welding machine imported from Germany and special pipe cutting tools from the United States. The water quality is divided into different grades, which are manual welding and automatic welding. The contact with purified water adopts automatic welding, passivation treatment after welding, and provides endoscope photos and a test report.
3. Filters, pressure gauges, conductivity probes, RO membrane shells, and ultraviolet rays that come into contact with product water are all sanitary clamp connections.
4. The pipelines in contact with the terminal pure water all meet the requirements of GMP3D. The rubber pad is PTPE. When the diaphragm valve is installed horizontally, it is 45 degrees. The slope of the circulating pipeline installation is set to 0.5, and the lowest point is set as the discharge point.
5. Each system shall set up sampling points to facilitate the detection of water quality.
6. The whole system adopts the integration of three-dimensional design, production, processing and installation, and is equipped with a circulating return water pipeline to prevent stagnant water pipelines.

Packing and shipping

Packing and shipping
Packing and shipping
Packing and shipping
Packing and shipping

Production Base

PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
< 12 >

FAQ

answer
We have more than 60 years in pharmaceutical water making equipment.
answer
Our factory is located in Weifang,Shandong, China.
answer
We will provide all the drawings for you to confirm before production.
answer
3 years warranty for the whole tank and the main equipment, accessories and auxiliaries.
answer
We can supply the installation. There are two options. The first option: We could appoint our engineer to your company to debug and repair, as for the cost of this trip such as ticket, visa, accommodation and labor cost shall be on your side. The second option: On-line service will be provided. If still under guarantee period, the necessary accessories and parts will be provided free, the buyer afford the transportation cost.
answer
Before the delivery, we will test and debug all machines in good condition and record the video for your checking.

If you like it, leave us a message now!

Through the above introduction, we believe that you have a sufficient understanding of us and can work with us with confidence. Please leave your information quickly, and we will send you samples or photo albums via express delivery! Attention: Our professionals will contact you as soon as possible!

Submit

Related Products