+
  • GMP-Purified-water-system(248).jpg

GMP Purified water system

GMP regulations for biopharmaceutical purified water equipment, in addition to the equipment design should comply with the production and processing technology requirements, the most important standard is that the equipment should be able to avoid cross-contamination, the equipment itself does not harm product quality, and is conducive to cleaning and maintenance, The design and proper layout of the equipment can minimize the risk of leakage.

Keywords:


Details description

GMP regulations for biopharmaceutical purified water equipment, in addition to the equipment design should comply with the production and processing technology requirements, the most important standard is that the equipment should be able to avoid cross-contamination, the equipment itself does not harm product quality, and is conducive to cleaning and maintenance, The design and proper layout of the equipment can minimize the risk of leakage.
1. The structure design should be simple, reliable, and easy to disassemble.

2. In order to facilitate disassembly, replacement and cleaning of parts, the design of the actuator should use standardized, generalized and systematic parts as much as possible.

3. The surface of the inner and outer walls of the equipment should be smooth and flat, without dead angle, easy to clean and sterilize. The surface of the parts should be treated with chrome plating to resist corrosion and prevent rusting. Avoid using paint on the outside of the equipment to prevent peeling.

4. The equipment for preparing purified water should be made of low carbon stainless steel or other materials that have been verified as not polluting the water quality. The equipment for preparing purified water should be cleaned regularly, and the cleaning effect should be verified.

5. Materials in contact with water for injection must be high-quality low-carbon stainless steel (such as 316L stainless steel) or other materials that have been verified to not pollute the water. The equipment for preparing water for injection should be cleaned regularly, and the cleaning effect should be verified.

6. The storage period of purified water should not be longer than 24 hours, and the storage tank should be made of stainless steel or other materials that have been proven to be non-toxic, corrosion-resistant and do not seep out polluting ions. To protect the vent, a hydrophobic sterilizing filter that does not shed fibers should be installed. The inner wall of the storage tank should be smooth, and there should be no dead ends and trachoma in the joints and welds. Sensors that display parameters such as liquid level, temperature and pressure that will not form stagnant water pollution should be used. The storage tank should be cleaned, disinfected and sterilized regularly, and the effect of cleaning and sterilization should be verified.

7. The design of pressure vessels must be undertaken by licensed units and qualified personnel, and must be handled in accordance with the National Standard of the People's Republic of China <Steel Pressure Vessels (GB150-80) and the relevant regulations of "Pressure Vessel Safety Technical Supervision Regulations"). .

Packing and shipping

Packing and shipping
Packing and shipping
Packing and shipping
Packing and shipping

Production Base

PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
PRODUCTION BASE
< 12 >

FAQ

answer
We have more than 60 years in pharmaceutical water making equipment.
answer
Our factory is located in Weifang,Shandong, China.
answer
We will provide all the drawings for you to confirm before production.
answer
3 years warranty for the whole tank and the main equipment, accessories and auxiliaries.
answer
We can supply the installation. There are two options. The first option: We could appoint our engineer to your company to debug and repair, as for the cost of this trip such as ticket, visa, accommodation and labor cost shall be on your side. The second option: On-line service will be provided. If still under guarantee period, the necessary accessories and parts will be provided free, the buyer afford the transportation cost.
answer
Before the delivery, we will test and debug all machines in good condition and record the video for your checking.

If you like it, leave us a message now!

Through the above introduction, we believe that you have a sufficient understanding of us and can work with us with confidence. Please leave your information quickly, and we will send you samples or photo albums via express delivery! Attention: Our professionals will contact you as soon as possible!

Submit

Related Products